| PART |
Description |
Maker |
| AT49BV-LV002 AT49BV002-90VI ATMELCORP.-AT49BV-LV00 |
2-Megabit (256K x 8) Single 2.7-volt Battery-VoltageFlash Memory 2兆位56K × 8)单2.7伏电池电压⑩闪存 x8 Flash EEPROM 2-Megabit (256K x 8) Single 2.7-volt Battery-Voltage Flash Memory
|
Atmel, Corp. Atmel Corp. ATMEL Corporation
|
| AT49BV-LV002 AT49LV002T AT49BV002 AT49BV002N AT49B |
2-MEGABIT (256K X 8) SINGLE 2.7-VOLT BATTERY-VOLTAGE⒙ FLASH MEMORY 2-Megabit (256K x 8) Single 2.7-volt Battery-Voltage⑩ Flash Memory
|
ATMEL[ATMEL Corporation]
|
| M38747M4T-XXXFS M38747M4T-XXXGP M38748E4T-XXXFS M3 |
DCM37PP Single 2.7-V High-Slew-Rate Rail-to-Rail Output Operational Amplifier w/Shutdown 8-SOIC 0 to 70 Quad 1.8-V, Micro-power, Rail-to-Rail, Single Supply Amplifier with Shutdown 16-SOIC -40 to 85 Quad 1.8-V, Micro-power, Rail-to-Rail, Single Supply Amplifier with Shutdown 16-SOIC 0 to 70 Single 2.7-V High Slew Rate Rail-to-Rail Output Operational Amplifier 8-SOIC 0 to 70 Single 2.7-V High Slew Rate Rail-to-Rail Output Operational Amplifier 5-SOT-23 0 to 70 BATTERY, SILVER OXIDE, V317; Voltage, output:1.5V; Capacity, energy storage:12.5mAh; Technology, Battery:Silver Oxide; Length / Height, external:1.7mm; Diameter, body:5.8mm; Battery size code:Button; Weight:0.18g RoHS Compliant: NA BATTERY, SILVER OXIDE, V315; Voltage, output:1.5V; Capacity, energy storage:21mAh; Technology, Battery:Silver Oxide; Length / Height, external:1.6mm; Diameter, body:7.9mm; Battery size code:Button; Weight:0.33g RoHS Compliant: NA BATTERY, SILVER OXIDE, V319; Voltage, output:1.5V; Capacity, energy storage:18mAh; Technology, Battery:Silver Oxide; Length / Height, external:2.7mm; Diameter, body:5.8mm; Battery size code:Button; Weight:0.31g RoHS Compliant: NA Global Limit Switches Series GLS: Wobble - Coil Spring, 2NC Slow Action, 20 mm CABLE FLAT FLEX 16POS 1MM 2,1 Single 2.7-V High-Slew-Rate Rail-to-Rail Output Operational Amplifier w/Shutdown 8-SOIC -40 to 125 Single 2.7-V High-Slew-Rate Rail-to-Rail Output Operational Amplifier w/Shutdown 8-MSOP -40 to 125 Single 2.7-V High-Slew-Rate Rail-to-Rail Output Operational Amplifier w/Shutdown 8-PDIP -40 to 125 Single 2.7-V High-Slew-Rate Rail-to-Rail Output Operational Amplifier w/Shutdown 8-PDIP 0 to 70 SINGLE-CHIP 8-BIT CMOS MICROCOMPUTER 单芯位CMOS微机 SINGLE-CHIP 8-BIT CMOS MICROCOMPUTER 单芯8位CMOS微机 192280030 单芯位CMOS微机 Dual 1.8-V, Micro-power, Rail-to-Rail, Single Supply Amplifier with Shutdown 14-SOIC -40 to 85 单芯位CMOS微机 Dual 1.8-V, Micro-power, Rail-to-Rail, Single Supply Amplifier with Shutdown 10-MSOP -40 to 85 单芯位CMOS微机 Quad 1.8-V, Micro-power, Rail-to-Rail, Single Supply Amplifier 14-SOIC 0 to 70 单芯位CMOS微机 Quad 1.8-V, Micro-power, Rail-to-Rail, Single Supply Amplifier with Shutdown 16-TSSOP -40 to 85
|
Mitsubishi Electric Semiconductor Mitsubishi Electric Corporation Mitsubishi Electric, Corp. Renesas Electronics, Corp. http:// Mitsubishi Electric Sem...
|
| ADP3820 ADP3820AR-41 ADP3820AR-42 ADP3820ART-41 AD |
20V; lithium-ion battery changer. For Li-Ion battery chargers, desktop computers, hand-held instruments Circular Connector; No. of Contacts:17; Series:; Body Material:Aluminum Alloy; Connecting Termination:Solder; Connector Shell Size:20; Circular Contact Gender:Socket; Circular Shell Style:Cable Receptacle; Insert Arrangement:20-29 RoHS Compliant: No Circular Connector Cable Assembly; Connector Type A:Circular Receptacle; Connector Type B:Stripped End Leads; Cable Length:10ft RoHS Compliant: Yes Lithium-Ion Battery Charger ±1% Precision, Single Cell Li-Ion Battery Charger
|
Analog Devices, Inc. AD[Analog Devices]
|
| 303Y 303DR 303HR |
Standard LED Lamp Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset 标准LED
|
Cinch Connectors
|
| MIC79050-4.2BM MIC79050-4.2BS |
Simple Lithium-Ion Battery Charger Preliminary Information 1 A BATTERY CHARGE CONTROLLER, PDSO8 GT 48C 48#16 SKT RECP WALL RM 1 A BATTERY CHARGE CONTROLLER, PSSO3
|
Micrel Semiconductor, Inc. MICREL INC
|
| MAX6430 MAX6431 MAX6432 MAX6433 MAX6434 MAX6435 MA |
3.4 V, Low-power, single/dual-level battery monitor with hysteresis Low-Power Single/Dual-Level Battery Monitors with Hysteresis Low-Power, Single/Dual-Level Battery Monitors with Hysteresis 2.4 V, Low-power, single/dual-level battery monitor with hysteresis 3.5 V, Low-power, single/dual-level battery monitor with hysteresis
|
MAXIM[Maxim Integrated Products] MAXIM - Dallas Semiconductor
|
| 2244 3080-1B 3500-10B 3610-12B 3320-8B 3180-3B |
BIN BOX STACKABLE Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset Microprocessor Supervisory Reset Circuits with Edge-Triggered, One-Shot Manual Reset Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset 过境 TRANSIT BOX 过境
|
YEONHO Electronics Co., Ltd.
|
| 2SK2142 2SK1884 2SK1893 2SJ269 2SK1892 2SK1885 2SK |
Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset TRANSISTOR | MOSFET | N-CHANNEL | 30V V(BR)DSS | 22A I(D) | TO-220AB TRANSISTOR | MOSFET | P-CHANNEL | 100V V(BR)DSS | 6A I(D) | TO-220AB TRANSISTOR | MOSFET | N-CHANNEL | 60V V(BR)DSS | 15A I(D) | TO-220AB TRANSISTOR | MOSFET | N-CHANNEL | 60V V(BR)DSS | 30A I(D) | TO-220AB TRANSISTOR | BJT | NPN | 80V V(BR)CEO | 3A I(C) | SOT-186 Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset 晶体管| MOSFET的| N沟道| 400V五(巴西)直| 9A条(丁)|20CI TRANSISTOR | MOSFET | N-CHANNEL | 400V V(BR)DSS | 16A I(D) | TO-220AB 晶体管| MOSFET的| N沟道| 400V五(巴西)直| 16A条(丁)| TO - 220AB现有 Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset 晶体管| MOSFET的| N沟道| 400V五(巴西)直| 5.5AI(四)| TO - 220AB现有 Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset 晶体管| MOSFET的| N沟道| 400V五(巴西)直| 7A条(丁)| TO - 220AB现有 Low-Power, Single-/Dual-Level Battery Monitors with Hysteresis and Integrated µP Reset 晶体管| MOSFET的| P通道| 60V的五(巴西)直| 8A条(丁)| TO - 220AB现有 TRANSISTOR | MOSFET | N-CHANNEL | 450V V(BR)DSS | 10A I(D) | TO-220AB
|
Molex, Inc. Sanyo Electric Co., Ltd.
|
| PB300P-12 PB300P-24 PB300P-48 PB360N-12 PB360N-24 |
300W Single Output Battery Charger
|
Mean Well Enterprises Co., Ltd.
|
| WS4508S |
1000mA, Single Li-ion Battery Charger
|
TY Semiconductor Co., L...
|
| BH-21-3 BH-24-3 BH-22-3 |
BATTERY HOLDERS D, 9V SINGLE & MULTIPLE CELLS
|
Adam Technologies, Inc. http://
|