Part Number Hot Search : 
TB0258A 3F3P6 BPW20 FR120 1N6325E3 2F8718DS 019071 2N2905AL
Product Description
Full Text Search
 

To Download EK14 Datasheet File

  If you can't view the Datasheet, Please click here to try to view without PDF Reader .  
 
 


  Datasheet File OCR Text:
 
INTRODUCTION
The EK14 evaluation kit provides a convenient way to breadboard circuits using Apex power op amps packaged in the 12-pin SIP03 package. The amplifier may be mounted vertically with the HS20 heat sink, or horizontally. Connections are provided for required power supply bypassing, external compensation components, as well as current limit resistors. A large area for component mounting provides flexibility and makes a multitude of circuit configurations possible.
ASSEMBLY
1. On the silk screen side of the evaluation board, insert and solder the MS06 mating socket in DUT holes 1 - 12. Be sure each one is fully seated. 2. Solder components for your circuit. Be sure to include proper bypassing, required compensation components and current limit resistors. See the op amp data sheet for help in selecting these components. 1uF capacitors and a .15 resistor have been included with the EK12 kit but may be replaced with other components as necessary. 3. Place the TW07 thermal washer on the heat sink over the mounting hole for the DUT. Place a #6 screw through the mounting hole and thread a #6 nut onto the screw at the back of the heat sink. Do not tighten. Note that there are two sets of mounting holes on the HS20. Holes on one edge allow room between the DUT and evaluation board for the MS06 socket. The holes on the other edge are for direct through hole mounting of the DUT to the evaluation board. It is recommended that you use the MS06. 4. Mount the DUT to the HS20 by sliding under the head of the #6 screw and on top of the thermal washer. Tighten the nut to the specified 8 to 10 in-lbs. (.9 to .13 N*M). Do not over torque. 5. Install leads of the DUT into the MS06 on the evaluation board. Use #6 self-tapping screws to secure the evaluation board to the HS20 heat sink as shown in the assembly diagram (Figure 1).
CAUTION PARTS LIST
Part # HS20 EVAL16 MS06 OX7R105KWN CSR10 TWO7
Use the supplied thermal washers or thermal grease between the power amplifier and the heat sink. Description Heatsink PC Board Mating Socket 1F Ceramic Capacitor .15 Resistor Thermal Washer Quantity 1 1 1 2 2 1 package
BEFORE YOU GET STARTED
* All Apex amplifiers should be handled using proper ESD precautions. * Always use the heat sink and thermal washers included in this kit. * Always use adequate power supply bypassing. * Do not change connections while the circuit is powered. * Initially set all power supplies to the minimum operating levels allowed in the device data sheet. * Check for oscillations.
APEX MICROTECHNOLOGY CORPORATION * TELEPHONE (520) 690-8600 * FAX (520) 888-3329 * ORDERS (520) 690-8601 * EMAIL prodlit@apexmicrotech.com
1
EK14
FIGURE 1. PCB
EVALUATION KIT FOR SIP03 PIN-OUT



This data sheet has been carefully checked and is believed to be reliable, SHANNON ROAD * is assumed ARIZONA 85741 * USA * APPLICATIONS are subject 1 (800) 546-2739 APEX MICROTECHNOLOGY CORPORATION * 5980 NORTH however, no responsibility TUCSON, for possible inaccuracies or omissions. All specificationsHOTLINE: to change without notice.

2
EK14U REV B OCTOBER 2004
(c) 2004 Apex Microtechnology Corp.


▲Up To Search▲   

 
Price & Availability of EK14

All Rights Reserved © IC-ON-LINE 2003 - 2022  

[Add Bookmark] [Contact Us] [Link exchange] [Privacy policy]
Mirror Sites :  [www.datasheet.hk]   [www.maxim4u.com]  [www.ic-on-line.cn] [www.ic-on-line.com] [www.ic-on-line.net] [www.alldatasheet.com.cn] [www.gdcy.com]  [www.gdcy.net]


 . . . . .
  We use cookies to deliver the best possible web experience and assist with our advertising efforts. By continuing to use this site, you consent to the use of cookies. For more information on cookies, please take a look at our Privacy Policy. X